The challenge

The challenge was to create a 3D map of underground utility networks. This involved drawing cylinders between coordinate points, color-coding them to convey information, and storing them in a database so users could build the map collaboratively.

In this context, utility networks include power lines, water pipes, sewage systems, and similar infrastructure.

Technical tradeoffs

We chose Cesium.js to fit the hackathon's time constraints. An alternative like Three.js would have required more implementation time, though I felt it offered a more maintainable foundation and would be easier to work with in the long run.

We delivered a prototype within the deadline, though it still needed further development before it could become a finished product.

Our designer prepared the presentation below to explain the project:

Results

The project took 1st place in the challenge.